Thu, 16 May 2013 08:19:56 CDT   thomasnet.com

Used to close oil and gas wells in emergency, SeaONYX BOP Surface Control System incorporates Mark VIe architecture, which provides obsolescence management and enables components to be hot swapped while system is running. System's Engineering Workstation is based on Proficy Historian software, which collects and archives data at high speeds, sending it to electronic archive.

Fri, 03 May 2013 05:00:00 CDT   bizjournals.com

The ability to drill at higher pressures and hotter temperatures is critical to energy companies' ability to access billions of barrels of oil in the Gulf of Mexico, and a consortium led by the Houston office of London oil company BP Plc (NYSE: BP) is working to meet the challenge. Project 20K is an effort to drill offshore at pressures of 20,000 pounds per square inch and at temperatures of up to 350 degrees Fahrenheit.

Tue, 09 Apr 2013 13:20:03 CDT   ogj.com

Stone Energy Corp. has contracted a dynamically positioned deepwater drilling rig from Ensco PLC for its Cardona oil development program on Mississippi Canyon Block 29 in the Gulf of Mexico.

 
FacebookGoogle+Twitter
W3C Validator
 
© 2005-2013 energyDigger All Rights Reserved.
Privacy PolicyLegal Statement