Wed, 18 Jul 2012 05:27:46 CDT

Operators say the Fort Calhoun nuclear power plant is about halfway through several studies, changes and inspections that have been ordered before the plant can resume operation.

Read full article at: kgwn.tv

 
FacebookGoogle+Twitter
W3C Validator
 
© 2005-2013 energyDigger All Rights Reserved.
Privacy PolicyLegal Statement