Wed, 11 Jul 2012 14:58:16 CDT
Entergy Energy returned Palisades back to service today after the plant had been shut down for a month because of a leaking cooling tanks. The tank held borated water that would be used to cool the reactor in a plant emergency or when the reactor fuel needed to be replaced.
Read full article at: mlive.com
